In 2016 the Department called for submissions on new and revised activities under the Victorian Energy Efficiency Target (VEET) scheme. The Department would like to thank everyone who made a submission.  

An independent consultant was engaged to assist the Department to assess and consider a number of the submissions. Where specialist advice was not required, submissions were considered separately by Departmental officers. 

Please refer to the Department’s response to consultation for  the summary and outcomes and the technical consultant’s report for further information. 

Disclaimer: All views expressed in the information/submissions posted on this website are those of the individual contributors. The State of Victoria and the Department of Economic Development, Jobs, Transport and Resources will not be liable for any errors or omissions in this information, or any losses, injuries, or damages arising from its display or use. 

Please note that some submissions have not been published either at the request of the submitter or because they contain sensitive material.

Submissions received 

Company name Category of proposed activity
Aircon Off Passive energy-saving control components for IR controlled single-zone non-ducted reverse cycle (heat pump) air conditioners

(Confidential submission) 
Aquloc Install 1 x pair of In-Tap Flow Controllers with Zero Leak Technology (WELS 3 Stars) into 1 x tap set (both hot tap & cold tap)
Aqualoc  (DOC, 10.5 MB)
Australian Wind and Solar

Solar PV power diversion for cheap and efficient hot water
Australian Wind and Solar (DOCX, 18.5 KB)

Brotherhood of St. Laurence Amendment to schedule 19 Destruction of Refrigerator of Freezer
Brotherhood of St Laurence (DOCX, 427.0 KB)
Easy Warm

Solar PV water heating utilising photovoltaic modules
Easy Warm (DOCX, 30.0 KB)

Ebm-papst High efficiency EC fan upgrades in HVAC. PBA methodology.
Ebm-papst (DOCX, 26.5 KB)
Edge Electrons Pty Ltd

Conservation Voltage Reduction (CVR) for Households
Edge Electrons (DOCX, 442.0 KB)

Embertec
  • New activity – Home Energy Gateway devices;
  • Revised activity – Information Technology (IT) standby power controllers (SPC) in commercial and non-residential premises;
  • New activity– Thermostatic Water Shutoff Valve
(Confidential Submission)  
Energy Australia
  • Power factor correction
  • Voltage optimisation

(Confidential Submission) 

Energy Makeovers
  • Power factor correction
  • Voltage optimisation

(Confidential Submission) 

Enviroflex

Amendments to existing activity Underfloor Insulation
Enviroflex (DOCX, 17.0 KB)

Expert Group

High Efficiency Refrigerated Display Cabinet replacing Refrigerated Display Cabinet
Expert Group (DOCX, 19.2 KB)

FMAANZ Projects that improve the energy performance of fans in refrigeration systems, and ventilation fans servicing commercial and industrial buildings and the common areas of residential buildings
FMAANZ (DOCX, 26.8 KB)
General Innovation Australia Replacement of existing light globes with smart LED light globes in E27 / B22 GLS applications .
General Innovation Australia (DOCX, 22.1 KB)
Graeme Doreian

Improve performance of air-conditioning ductwork
Graeme Doreian (DOCX, 26.5 KB)

Heatermate

Retrofit device – thermostat plug for heater
Heatermate (DOCX, 25.1 KB)

Insulation Australasia

Reintroduction of Ceiling Insulation
Insulation Australasia (DOCX, 15.1 KB)

Solartek

Smart hot water controller that controls water temperature, heat up times and capacities and is solar thermal and PV compatible.

(Confidential submission)

Southern Cross Metal Recyclers Amendments to Schedule 19 – fridge freezer destruction
Southern Cross Metal Recyclers (DOCX, 64.5 KB)
The Green Guys Group
  • Power factor correction
  • Voltage optimisation

(Confidential Submission) 

Thermoshield

Liquid thermal insulation
Thermoshield (DOCX, 208.2 KB)

Watts Clever Amendments to existing activity In-Home Displays
Watts Clever (DOCX, 38.9 KB)
Yanmar Energy Australia Gas Powered Reverse Cycle Air Conditioning
Yanmar Energy Australia (DOCX, 21.7 KB)

Page last updated: 24/06/20